Skip to content

ISPACG.com

  • ISPACG
    • Letter of Agreement (LOA)
    • Co-Chairs
    • South Pacific UPR Requirements
  • Subsidiary Working Groups
    • Datalink Working Group
    • FANS1/A Interoperabilty Team (FIT)
    • ISPACG Adaptation/Database Points of Contact
    • ISPACG – Space Operations Points of Contact
    • ISPACG Planning Team
  • RMAs
  • ISPACG/38
  • Previous Events
    • ISPACG/37
    • ISPACG/36
    • ISPACG/35
      • Meeting papers ISPACG/35
    • ISPACG/34
      • Virtual Meeting 29-30 July 2020
    • ISPACG/33
      • Meeting Papers
    • ISPACG/32
      • Check-in Meeting 24Oct18
      • ISPACG/32 Documentation
      • FIT/25 Documentation
    • ISPACG/31
    • ISPACG/30
      • ISPACG/30 Working Papers
      • ISPACG/30 Information Papers
      • FIT/23
      • ISPACG PT/19
    • ISPACG/29
    • ISPACG/28
    • ISPACG/27
    • ISPACG/26
    • ISPACG/25
    • ISPACG/24
    • ISPACG/23
    • ISPACG/22
    • ISPACG/21
    • ISPACG/20
    • ISPACG/19
    • ISPACG/18
    • ISPACG/17
    • ISPACG/16
  • ISPACG 39

ISPACG/28 Information Papers

ISPACG/28 Information Papers

ISPACG28 IP INDEX v3
IP-01   Lost Fuel Savings due to Lack of RP4 & FANS1/A Equipage
IP-01   ATT.1   RNP FANS Fuel Savings
IP-02   ICAO Inter-Regional AIDC Task Force
IP-03   Status of CFCG
IP-04   ASPIRE Update
IP-05   ADS-C Climb/Descend Procedure Project Overview
IP-05   ATT.1   MCR:  ADS-C CDP
IP-06   ADS-B ITP Operational Flight Trial Project Status
IP-07   SATVOICE for ATS Communication
IP-07   ATT.B   Draft FAA MMEL Policy
IP-08   Seamless Airspace in Chile
IP-09   JCAB Update
IP-10   HF Working Group Update
IP-11   ADS-B Implementation in French Polynesia
IP-11   ATT.1   ADS-B Implementation VHF Extension in Tahiti FIR
IP-12   PBN in French Polynesia
IP-13   ADS-B ITP
IP-14   Australian ADS-B Update
IP-15   FMC WPR in YBBB

 

 

Powered by WordPress